Blog · Blogs
Case Study: Comprehensive Fire Safety Solution for Factories with ALC Panels
Fire prevention and fighting in factories and workshops is an extremely important issue for production facilities in Vietnam, and is a mandatory condition according to legal regulations to be allowed to operate.
The need for effective fire-resistant construction materials is more urgent than ever. We are proud to supply ALC panels, which play an important role in enhancing fire safety for many factories and workshops.
Project Overview
Project: Cainiao Dong Nai Smart Logistics Park (Core member of Alibaba Group)
Location: Giang Dien, Dong Nai province.
Scale: 90,000m2.
Requirements: REI 150 fire-resistant walls comply with QCVN06/2022.
Solution: Using HASS's 150mm thick ALC lightweight concrete panels.
Results: Certified qualified for fire prevention and fighting.
- Fire Safety Regulations: Comply with strict fire safety regulations to protect workers and property.
- Material Durability: Construction materials must withstand conditions of durability, rapid construction and fire resistance in accordance with QC06/2022. In addition, ALC panels are also a green material, going along with the trend Net Zero of Vietnam and the world
Deployment
To address these challenges, we have supplied ALC panels for fire-resistant wall construction. ALC panels were chosen for their outstanding fire resistance, high durability and ease of installation.
Installation Process
- Preparation: The project began with coordination between the parties on technical requirements, construction methods and production of ALC lightweight concrete panels.
- Installation: Strictly following safety procedures, ALC panels are installed at the construction site, forming a solid fire-resistant barrier.
- Acceptance: The project has been inspected and approved by the fire department.
- Fire Resistance: ALC panels provide excellent fire safety, reducing the risk of fire spreading in the factory.
- Regulatory Compliance: All projects meet fire safety regulations and ensure necessary certifications.
- Durability and Efficiency: ALC panels have proven their durability in industrial conditions and are quick to install, helping the project to be put into use soon.
The use of HASS's ALC panels at the Cainiao factory has proven effective in enhancing fire safety. By choosing ALC panels, factories not only comply with fire safety regulations but also ensure a safer working environment for employees.
Learn more about HASS's ALC lightweight concrete panels here
Need a quotation or technical advice?
Send a request and the HASS technical team will respond during business hours.


